Unity Campus, Cambridge
RMF were appointed as the sole raised flooring contractor to supply and install the raised access flooring at Phase 2 of the Unity Campus Development in South Cambridge.
The scope of works was to supply and install to buildings A1, A2 and B with each building completed sequentially. The works were completed to a CAT-A standard and comprised of offices and multi occupancy lab space. The buildings were designed speculatively to house future life sciences tenants.
RMF’s works on site included;
- Supply and installation of RMF Eco Range to building B
- Supply and installation of RMF Heavy Grade PSA screw down panels to lab areas and twice mechanically fixed
- Supply and installation of RMF Titan PSA panels
- Two coats of PVA sealer
- 30 Minute AIM cavity barrier
RMF worked in tandem with other trades and the main Tier 1 contractor to work efficiently and safely.
We look forward to seeing what fantastic scientific progress the incoming tenants can achieve in their new workplace.
To work with a raised flooring contractor confident with all sectors speak to the RMF team today on 01926 425289.